Concrete Slab Cost Calculator

A finished concrete slab costs about $6–$12 per square foot installed in 2026; the concrete itself runs $150–$180 per cubic yard. Enter your slab size and thickness to see the yards to order, the material cost, and the total with labor.

Your slab
volume (cu yd) = length × width × (thickness ÷ 12) ÷ 27 · order = volume × (1 + waste) rounded up to the next ¼ yard · material = order × price per yard

Four inches suits patios and shed pads; use 5–6 inches for driveways and garage floors that carry vehicles. Ready-mix prices run about $150–$180 per cubic yard nationally in 2026, and trucks often add a short-load fee under 3–4 yards.

Estimates only. Forms, gravel base, reinforcement, finishing, and permits are separate costs — a contractor quote bundles them, which is why installed prices per square foot run higher than the material figure here.

How the concrete slab cost calculator works

Slab cost starts with volume. Cubic yards = length × width × thickness in feet, divided by 27 — a 20 × 20 ft slab at 4 inches is 400 × 0.333 ÷ 27 = 4.94 cubic yards before waste. Thickness is the trap: it is measured in inches, so divide by 12 first, and remember that moving from 4 to 6 inches adds half again as much concrete.

Order more than the neat volume. The calculator adds your waste allowance (10% is the standard planning figure for spillage, uneven subgrade, and over-excavation) and rounds up to the next quarter yard, because ready-mix is sold in quarter-yard steps and running short mid-pour means a second delivery fee and a cold joint in the slab.

Material is only part of a finished price. Ready-mix at $150–$180 per yard is the concrete alone; forms, gravel base, rebar or mesh, pouring and finishing labor, and permits sit on top. That is why contractor quotes land near $6–$12 per square foot installed while the material in this calculator works out nearer $2–$3 per square foot — enter a labor rate per square foot to bridge the two.

cu yd = L × W × (in ÷ 12) ÷ 27 · order = cu yd × (1 + waste%) rounded up to ¼ yd · total = order × $/yd + area × labor $/sq ft

Related tools

Need the material quantities without prices? Use the Concrete Slab Calculator for yards and bags, the Concrete Cubic Yard Calculator for any shape, or price a full garage floor with the Concrete Garage Floor Cost Calculator.

Concrete slab cost calculator FAQ

How much does a concrete slab cost per square foot?

Installed, a finished slab runs about $6–$12 per square foot in 2026 depending on thickness, finish, and region. The concrete material alone is much less — roughly $2–$3 per square foot for a 4-inch slab at $150–$180 per cubic yard. Stamped or colored finishes, thickened edges, and difficult access push quotes above the range.

How much does a 20x20 concrete slab cost?

A 20 × 20 ft slab at 4 inches needs 4.94 cubic yards before waste, or 5.5 yards ordered with 10% extra — about $825–$990 of ready-mix at $150–$180 per yard. Fully installed with base, forms, reinforcement, and finishing, the same slab typically runs $2,400–$4,800.

How much does a 10x10 concrete slab cost?

A 10 × 10 ft slab at 4 inches is 1.23 cubic yards, or 1.5 yards ordered with waste — roughly $225–$270 of concrete. Installed, expect about $600–$1,200. Small pours cost more per square foot because delivery minimums and short-load fees spread over fewer yards.

How many cubic yards of concrete do I need for a slab?

Multiply length by width by thickness in feet and divide by 27. A 20 × 20 ft slab at 4 inches is 4.94 cubic yards; at 6 inches it is 7.41. Add 10% for waste and round up to the next quarter yard before ordering — this calculator does both steps for you.

Is it cheaper to use bags or ready-mix?

Bags win on tiny jobs: under about 1 cubic yard, mixing 80 lb bags (each makes 0.6 cubic feet) avoids delivery and short-load fees. Above 1–2 yards ready-mix is cheaper per yard and far less labor — a 20 × 20 slab would take about 245 bags, which is a full day of mixing for a worse, less consistent slab.

What makes a concrete slab quote higher?

Thickness is the biggest lever — 6 inches uses 50% more concrete than 4. After that: excavation and gravel base, rebar instead of fiber, stamped or exposed-aggregate finishes, pumping when a truck cannot reach the forms, permits, and tear-out of an old slab. Get the base and reinforcement right; they are cheap insurance compared with replacing a cracked slab.

How thick should a concrete slab be?

Four inches is standard for patios, walkways, and shed pads. Driveways and garage floors that carry vehicles need 5–6 inches, and slabs under heavy equipment or RV parking often go to 6 inches with rebar. Thickness barely changes labor, so going one inch thicker is inexpensive strength.