Paver Edging Calculator
A patio with 100 feet of open edge needs 27 four-foot edging strips and 100 anchoring spikes — about $158 in materials. Enter your perimeter below for the exact strips, spikes and cost.
Only the open edges need edging. A side that runs along the house, a wall or an existing slab needs nothing — the structure itself holds the pavers — so subtract those lengths before you count. Where two paved shapes meet, subtract the shared side: it sits inside the paving. Plastic edging comes in 4 ft strips (and 8 ft straight sections, 6 ft flexible for curves), spiked with 10-inch galvanized steel spikes every 12 inches on straight runs and every 6 inches on curves and at corners. The spikes go into the compacted aggregate base, not into loose soil — the base must extend 6 to 12 inches past the pavers for them to bite.
Edging and spikes only. This page does not count pavers, base stone, bedding sand or polymeric sand — those stay on the Paver Calculator, the Paver Base Calculator and the Polymeric Sand Calculator. Estimates only: aluminium or steel edging and concrete haunching cost more per foot than plastic, and a driveway needs a stronger edge than a patio.
How the paver edging calculator works
Edge restraint is not optional: without it the outer pavers creep outward over time, the joints open, and the whole field unravels from the edge inward. The count starts with the open edge — the total perimeter minus every side that runs along the house, a wall or an existing slab, because those sides need no edging at all. Strips equals the open edge times one plus the extra allowance, divided by the strip length, rounded up. On the default patio — 116 ft of perimeter with 16 ft against the house, so 100 ft of open edge — that is 100 x 1.05 = 105 ft, divided by 4 ft strips, or 26.25, so buy 27 strips.
The spikes follow the open edge, not the strips: one 10-inch steel spike every 12 inches on straight runs, every 6 inches on curves and at corners. The default patio needs 100 spikes at 12-inch spacing — one per foot — and 200 if the whole edge runs in curves. Drive the spikes through the edging holes directly into the compacted aggregate base, never into loose soil: the base has to extend 6 to 12 inches past the pavers for the spikes to bite, which is why the base is always laid wider than the field.
Strip length is a choice, not a rule. Plastic edging commonly comes in 4 ft strips, straight sections in 8 ft, flexible edging for curves in 6 ft. The same 100 ft of open edge takes 27 four-foot strips, 14 eight-foot sections, or 18 six-foot flexible sections — the count changes but the edge covered does not. The 5% extra covers cuts and breakage; use 8 to 10% on a patio with many curves or a diagonal lay, where more strips get cut.
Worked example at a smaller scale: a 16 by 12 ft patio has a 56 ft perimeter. Set against the house along one 16 ft side and the open edges fall to 40 ft — 16 ft less edging to buy. At 8 ft straight sections with 5% extra that is 40 x 1.05 / 8 = 5.25, so 6 sections, and 40 spikes at 12-inch spacing. The same patio with no side against the house needs 56 ft of edging: 56 x 1.05 / 8 = 7.35, so 8 sections, and 56 spikes.
Common mistakes: edging the whole perimeter including the side against the house, which buys edging you do not need; spiking into soil instead of the compacted base, which lets the edge walk the first winter; and installing the edging after the pavers instead of before — the edging goes in first, tight against the base, and the pavers butt up to it. Plastic edging runs about $2 to $4 per linear foot installed, aluminium or steel $4 to $8, and a wet-set concrete toe $5 to $10 — a driveway wants the stronger edge.
open edge = perimeter - edges against house, wall or slab · strips = ceil(open edge x (1 + extra) / strip length) · spikes = ceil(open edge x 12 / spacing in inches) · 4 ft strips, 8 ft straight, 6 ft flexible · 12 in spacing straights, 6 in curves
Related tools
Count the pavers themselves with the Paver Calculator, the base stone with the Paver Base Calculator, and the joint sand with the Polymeric Sand Calculator. A patio against a lawn edge takes the Landscape Edging Calculator instead — different product, same idea.
Paver edging calculator FAQ
How much paver edging do I need?
Measure only the open edges — the perimeter minus any side against the house, a wall or an existing slab — then divide by the strip length and round up. 100 ft of open edge with 5% extra is 105 ft, or 27 four-foot strips.
How many spikes do I need for paver edging?
One 10-inch steel spike every 12 inches on straight runs, every 6 inches on curves and at corners. 100 ft of open edge needs 100 spikes on straights, 200 if the whole edge runs in curves.
Do I need edging on the side against the house?
No — a side that runs along the house, a wall or an existing slab needs nothing, because the structure itself holds the pavers. Subtract those lengths before you count, or you will buy edging you do not need.
What size edging strips should I buy?
Plastic edging commonly comes in 4 ft strips, straight sections in 8 ft, flexible edging for curves in 6 ft. The count changes with the length — 100 ft takes 27 four-foot strips or 14 eight-foot sections — but the edge covered does not.
Do the spikes go into the soil or the base?
Into the compacted aggregate base, never into loose soil. The base must extend 6 to 12 inches past the pavers so the spikes have something to bite into — spikes in soil let the edge walk the first winter.
When do I install paver edging?
Before the pavers, not after. The edging goes in first, tight against the compacted base, and the pavers butt up to it. Edging installed after the field is laid never sits tight.
How much does paver edging cost?
Plastic edging runs about $2 to $4 per linear foot, aluminium or steel $4 to $8, and a wet-set concrete toe $5 to $10 per foot installed. The default patio — 27 strips and 100 spikes — is about $158 in materials at $4 a strip and $0.50 a spike.