Enter your clear span and this LVL beam span calculator returns the rule-of-thumb depth, the next stocked size, the beam width for your ply count, and an estimated material cost — as a planning estimate to check against manufacturer tables.

Your LVL beam
rule of thumb: required depth (in) = span (in) / 20 · width = plies x 1.75 in · rule-of-thumb span of a depth = depth x 20 / 12 ft

Planning estimate, not a substitute for professional approval. Real LVL spans depend on load, grade, manufacturer tables and local code. Confirm the size with the manufacturer span tables, your building department or a licensed engineer before building.

How the LVL beam span calculator works

The widely quoted rule of thumb for manufactured beams is depth = span in inches divided by 20, with beam width roughly one-quarter to one-third of the depth. LVL is sold in 1-3/4 inch plies, so a 2-ply beam is 3-1/2 inches wide and a 3-ply beam is 5-1/4 inches wide, and stocked depths run from 5-1/2 inches up to 24 inches.

Worked example: a 20-foot span needs 240 / 20 = 12 inches of depth by the rule of thumb, so the next stocked depth is 14 inches. Two plies give a 3-1/2 inch wide beam, and at $12 per linear foot per ply the material costs 20 x $12 x 2 = $480. The same rule read backwards says an 11-7/8 inch deep beam spans roughly 11.875 x 20 / 12 = 19.8 feet.

Common mistakes: treating the rule of thumb as a code-approved design (it is not — loads, grade and manufacturer tables govern), sizing by depth alone and forgetting plies carry the load width, and using a dimensional-lumber span table for LVL. Always confirm against the manufacturer span table for the exact product and load before ordering.

required depth (in) = span (in) / 20 · width = plies x 1.75 in · rule-of-thumb span (ft) = depth (in) x 20 / 12

Related tools

Also try the Floor Joist Span Calculator for sawn joists, the Deck Joist Span Calculator for outdoor decks, and the Roof Truss Cost Calculator for roof framing.

LVL beam span calculator FAQ

What size LVL beam do I need for a 20-foot span?

By the span-over-20 rule of thumb, 240 / 20 = 12 inches of depth, so the next stocked depth is 14 inches. Width depends on load: 2 plies (3-1/2 inches) is common for residential work, but the manufacturer table for your load governs.

What is the span-over-20 rule for LVL beams?

Divide the span in inches by 20 to estimate the required depth in inches. A 16-foot span (192 inches) estimates to about 9.6 inches, so a 9-1/4 inch beam is just under and an 11-1/4 inch beam is the conservative stocked choice.

How wide should an LVL beam be?

LVL comes in 1-3/4 inch plies: 1 ply is 1-3/4 inches, 2 plies 3-1/2 inches, 3 plies 5-1/4 inches and 4 plies 7 inches. Width is roughly one-quarter to one-third of the depth, and more plies carry more load.

How far can an 11-7/8 inch LVL span?

By the rule of thumb, about 19.8 feet (11.875 x 20 / 12). Published manufacturer tables vary with load and grade, so treat this as a planning figure, not a design value.

Is this calculator a substitute for an engineer?

No. It is a planning estimate only. Real spans depend on dead and live loads, tributary width, grade, bearing and local code — confirm with the manufacturer span tables or a licensed engineer.

What stocked LVL depths are available?

Common stocked depths are 5-1/2, 7-1/4, 9-1/4, 11-1/4, 11-7/8, 14, 16, 18, 20 and 24 inches. This calculator rounds your rule-of-thumb depth up to the next stocked size.

How is the material cost estimated?

Span in feet times price per linear foot per ply times the number of plies. At $12 per foot per ply, a 20-foot 2-ply beam costs $480 in material, before hangers, bearing and labor.