Drip Edge Calculator
A roof with 130 feet of eave and 70 feet of rake at a 6/12 pitch needs 22 ten-foot pieces of drip edge and 209 nails. Enter your eave and rake lengths and pitch below — the calculator corrects the rakes up the slope and subtracts the 2-inch laps.
Two things stand between a plan's measurements and the piece count that actually ships: the rakes on a plan are horizontal runs, while drip edge is installed along the slope itself, and every piece after the first surrenders part of its length to the piece before it at the overlap. This calculator corrects for both. IRC Section R905.2.8.5 requires a drip edge at the eaves and gables of shingle roofs, with adjacent segments overlapping a minimum of 2 inches.
Planning estimate — not a code approval. Valleys, dormers, and other roof breaks add drip edge or flashing this simple two-measurement model does not capture. Drip edge goes under the underlayment at the eaves and over it at the rakes. Confirm the code edition your area adopted.
How the drip edge calculator works
Drip edge is bought by the piece, not the foot, and two corrections stand between a plan's measurements and the piece count that actually ships. First, the rakes on a plan are horizontal runs, while drip edge is installed along the slope itself: a rake run is corrected up the slope by the pitch multiplier, the square root of 1 plus (rise over 12) squared — at 6/12 that is 1.118, so a 70 ft rake run is really 78.3 ft of drip edge. Eaves run level, so their plan length is already the installed length.
Second, every piece after the first surrenders part of its length to the piece before it at the overlap. IRC Section R905.2.8.5 requires adjacent segments to overlap a minimum of 2 inches, so a 10 ft stick only advances the run 9.83 ft. Pieces equals the total run divided by that effective length, rounded up: on the default roof, 130 ft of eave plus 78.3 ft of rake is 208.3 ft, and 208.3 / 9.83 = 21.2, so 22 pieces — 14 for the eaves and 8 for the rakes. Nails follow the total run directly at the spacing you choose: 208.3 ft at 12-inch spacing is 209 nails.
Worked example from the calculators: an 80 ft eave plus a 48 ft rake run at 6/12 pitch. The rake up the slope is 48 x 1.118 = 53.7 ft, the total run is 133.7 ft, and 133.7 / 9.83 = 13.6, so 14 pieces — with 134 nails at 12-inch spacing. The other common method adds 5% to the perimeter and divides by 10: a 200 ft perimeter becomes 210 ft, or 21 pieces. Both methods agree on the same roof — 200 ft divided by the 9.83 ft effective length is 20.3, also 21 pieces — because a 2-inch lap on a 10 ft stick is almost exactly 5% of the run.
The pitch correction is easy to forget and expensive to miss: at 4/12 the multiplier is 1.054, at 6/12 it is 1.118, at 8/12 it is 1.202, and at 12/12 it is 1.414 — a steep rake needs 41% more drip edge than its flat measurement. Longer 12 ft sticks cut the lap count: the same 208.3 ft run takes 22 ten-foot pieces but only 18 twelve-foot pieces (11.83 ft effective each), at the cost of harder handling on a steep roof.
Common mistakes: measuring the rakes flat and under-ordering by the pitch factor; dividing by the full 10 ft stick instead of the 9.83 ft effective length, which leaves you a piece short on a long run; and installing the drip edge over the underlayment at the eaves — it goes under the underlayment at the eaves so water runs off the deck and over the metal, and over the underlayment at the rakes so wind-driven rain cannot get under the felt. Drip edge became mandatory on all eaves and gable rakes under IRC R905.2.8.5 in the 2012 code cycle.
multiplier = sqrt(1 + (rise/12)^2) · rake slope = rake run x multiplier · total = eave + rake slope · effective piece = 10 ft - 2 in = 9.83 ft · pieces = ceil(total / effective) · nails = total / spacing
Related tools
Count the valley metal with the Roof Valley Flashing Calculator, the felt under it with the Roofing Felt Calculator, and the gutters with the Gutter Downspout Calculator. Check any pitch with the Roof Pitch Calculator.
Drip edge calculator FAQ
How many pieces of drip edge do I need?
Divide the total run — eaves plus rakes corrected up the slope — by 9.83 ft per 10 ft piece and round up. A roof with 130 ft of eave and 70 ft of rake at 6/12 pitch needs 22 pieces: 14 for the eaves and 8 for the rakes.
How much does roof pitch change the drip edge count?
The rake run is multiplied by the pitch factor: 1.054 at 4/12, 1.118 at 6/12, 1.202 at 8/12, and 1.414 at 12/12. A steep 12/12 rake needs 41% more drip edge than its flat plan measurement.
How much overlap does drip edge need?
A minimum of 2 inches between adjacent segments, per IRC Section R905.2.8.5. That is why a 10 ft stick only advances the run 9 feet 10 inches — dividing by the full 10 ft under-orders by about one piece per 60 ft of run.
How many nails do I need for drip edge?
One per foot of total run at the standard 12-inch spacing — 209 nails for the 208 ft example roof, or about 1 lb of 1-1/4 inch roofing nails per 130 nails. Space them closer, 6 to 8 inches, in high-wind zones.
Should I buy 10 ft or 12 ft drip edge?
Either works. Twelve-foot sticks mean fewer laps — 18 pieces instead of 22 on the example roof — but they are harder to carry and bend on a steep roof. Ten-foot sticks are the standard stock and easier to handle alone.
Does drip edge go under or over the underlayment?
Under it at the eaves, so water running off the deck flows over the metal and into the gutter; over it at the rakes, so wind-driven rain cannot get under the felt. Getting this backwards is the most common drip edge installation mistake.
Aluminum or galvanized steel drip edge?
Aluminum is lighter, will not rust, and is the common choice for residential roofs. Galvanized steel is stronger and cheaper, but it can rust where the coating is cut. Match the metal to the roof — never pair copper drip edge with aluminum gutters, or galvanic corrosion will eat one of them.