Deck Footing Calculator
A 16 ft deck with a 10 ft joist span, posts 8 ft apart, carrying 50 psf on 1,500 psf clay needs 16 in round footings — 3 footings, 2.8 cu ft of concrete, 6 bags of 80 lb mix. Enter your deck below for the footing size, count and concrete.
The IRC baseline load is 40 psf live plus 10 psf dead (50 psf) under R301.5; use the ground snow load instead if it is higher. Soil values are the IRC Table R401.4.1 presumptive values — use 1,500 psf clay unless you have a soil report. Diameters round up to the next whole inch, with 12 in the smallest practical form size. Planning estimate, not a substitute for professional approval: footings must sit below the local frost line on undisturbed soil, and decks need a permit and a footing inspection in most jurisdictions — confirm everything with your building department before you dig.
Formula vs code table. The IRC Table R507.3.1 lists somewhat larger footings than the formula — use the larger of the two. The calculator shows the table value when your soil is 2,000 psf. A sonotube poured full-depth needs far more concrete than the pad thickness used here — a 20 in tube 3 ft deep holds 6.54 cu ft on its own.
How the deck footing calculator works
The footing size comes from the tributary area — the patch of deck one post actually carries — not from the size of the post. On the default — a 16 ft ledger-attached deck, 10 ft joist span, no cantilever, posts 8 ft apart, 40 psf live plus 10 psf dead on 1,500 psf clay — the tributary area is 8 x (10 / 2 + 0) = 40 sq ft, the load is 40 x 50 = 2,000 lb, and the bearing area needed is 2,000 / 1,500 = 1.33 sq ft (192 sq in). The round diameter is 2 x sqrt(192 / pi) = 15.64 in, rounded up to a 16 in tube; the square side is sqrt(192) = 13.86 in, rounded up to 14 in. The beam has ceil(16 / 8) + 1 = 3 posts, so 3 footings; each 16 in footing 8 in thick holds pi x (16/24 / 2) squared x 8/12 = 0.93 cu ft, for 2.8 cu ft in total, 0.10 cu yd, or 6 bags of 80 lb mix with 10% extra.
The worked example is the ponderloop one, and it runs the same math at the same defaults — 16 ft deck, 10 ft span, 8 ft spacing, 50 psf on 1,500 psf clay — and lands on exactly the same answer: 40 sq ft tributary, 2,000 lb per footing, 1.33 sq ft of bearing, a 15.64 in exact diameter rounded up to 16 in, 3 footings, 0.93 cu ft each, 2.8 cu ft total, 6 bags of 80 lb mix. Every footing goes below the local frost line; the example checks bearing pressure only, and your building department governs.
The cross-check is the thecivilstudies one, and it shows why the code table matters. A deck with 12 ft joists and posts 8 ft apart gives a 48 sq ft tributary area — 8 x (12 / 2) — and a 2,400 lb load at 50 psf. On 2,000 psf soil that needs 1.2 sq ft of bearing, a 14.83 in round footing by the formula, rounded up to 15 in. But IRC Table R507.3.1 lists 17 in round or 15 in square for that same 48 sq ft — the table is more conservative than the formula, so the calculator shows the table value alongside and you use the larger of the two. The nrtechstudio check agrees at a bigger load: 60 sq ft at 50 psf is 3,000 lb, needing 2.00 sq ft on 1,500 psf clay, a 19.15 in round footing (use the next standard tube, 20 in) or 16.97 in square.
Measure the deck length along the house, the joist span from the house ledger to the beam, and any cantilever past the beam — the ledger carries half the span, so the tributary depth is span / 2 plus the cantilever. Post spacing is the distance between posts along the beam; 8 ft is the common maximum. Soil bearing uses the IRC Table R401.4.1 presumptive values: 1,500 psf for clay or silt, 2,000 for average soil, 2,500 for sandy gravel, 3,000 for gravel or rock — use 1,500 unless you have a soil report, since sizing on clay is safe on anything better. Footing thickness is the pad thickness, 6 in minimum in the code table and 8 to 12 in common; a sonotube poured full-depth uses the full depth instead, so a 20 in tube 3 ft deep holds 6.54 cu ft on its own.
Common mistakes: dividing the deck area by the post count instead of working out the tributary area — the end posts carry half what the interior posts carry; sizing on a guessed soil value instead of the 1,500 psf default, which is the safe side; digging a 19.15 in hole instead of buying the next standard tube size up; forgetting the frost line — the bottom of every footing must be below it and at least 12 in below grade; and treating this as a structural design — poor or filled soil, unusual geometry, hot tubs and anything outside the prescriptive limits need a licensed engineer.
tributary area = post spacing x (joist span / 2 + cantilever) for a ledger deck, post spacing x (deck depth / 2) for freestanding · load = tributary x (live + dead), IRC baseline 40 + 10 = 50 psf · bearing area = load / soil bearing capacity (IRC Table R401.4.1: 1,500 clay / 2,000 average / 2,500 sandy gravel / 3,000 gravel) · round diameter = 2 x sqrt(area / pi), square side = sqrt(area), both rounded up, 12 in minimum · posts per row = ceil(deck length / spacing) + 1 · concrete per footing = pi x (diameter/2) squared x thickness (round) or side squared x thickness (square) · bags = total concrete x 1.1 / bag volume (80 lb = 0.6 cu ft, 60 lb = 0.45 cu ft) · IRC Table R507.3.1 lists larger footings than the formula - use the larger
Related tools
Size the joists above the footings with the Deck Joist Span Calculator, space the posts with the Deck Post Spacing Calculator, price the frame with the Deck Build Cost Calculator, count the boards with the Deck Boards Calculator, and price the concrete with the Concrete Footing Calculator.
Deck footing calculator FAQ
How big should deck footings be?
It depends on the tributary area and the soil. A 16 ft deck with a 10 ft joist span and posts 8 ft apart on 1,500 psf clay needs 16 in round footings — 40 sq ft tributary, 2,000 lb per footing, 1.33 sq ft of bearing.
How do I calculate the tributary area of a deck post?
Post spacing x (joist span / 2 + cantilever) for a ledger-attached deck — the house ledger carries the other half of the span. For a freestanding deck it is post spacing x (deck depth / 2).
How deep should deck footings be?
Below the local frost line and at least 12 in below grade, on undisturbed soil. Frost depth is set locally — ask your building department.
How much concrete does a deck footing need?
A 16 in round footing 8 in thick holds 0.93 cu ft; 3 of them take 2.8 cu ft, or 6 bags of 80 lb mix with 10% extra. A sonotube poured full-depth takes far more — a 20 in tube 3 ft deep holds 6.54 cu ft.
How many footings does my deck need?
Posts per beam row = ceil(deck length / post spacing) + 1, times the number of beam rows — 1 for a ledger deck, 2 for freestanding. A 16 ft deck at 8 ft spacing needs 3 footings on one beam.
What soil bearing capacity should I use?
The IRC Table R401.4.1 presumptive values: 1,500 psf for clay or silt, 2,000 for average soil, 2,500 for sandy gravel, 3,000 for gravel or rock. Use 1,500 unless you have a soil report.
Round or square deck footings?
Round footings suit sonotubes and are the usual pick; square pads suit a dug hole. Both are sized by the same bearing area — 16 in round or 14 in square on the default deck — so pick the form you can build.