Shed Base Gravel Calculator
A 10 by 12 foot shed needs a 12 by 14 foot pad — 2.39 cubic yards of gravel with compaction, about 3.58 tons of crusher run, roughly $161. Enter your shed below for the exact pad, tons and cost.
The pad is the shed plus 1 foot on every side, so roof water lands on gravel, not on soil against the shed — a 10 by 12 ft shed takes a 12 by 14 ft pad. The 324 in the formula is 27 cubic feet in a cubic yard times 12 inches in a foot. Densities are the lumbermetrics pair — crusher run 1.50 tons per cubic yard, clean #57 1.40 — and the compaction allowance covers loose stone packing down under the compactor. Some yards quote crusher run as heavy as 1.80 tons per cubic yard, which is why other guides show higher tonnage for the same pad: confirm the density with your supplier before ordering.
Pad only — not the shed. This page sizes the gravel pad: volume, tons, landscape fabric and timber edging. It does not size the shed, its floor or its anchors. Estimates only: stone weight varies by quarry, moisture and region, and a soft or wet site may need 6 inches instead of 4.
How the shed base gravel calculator works
The pad comes first and the volume follows it. Make the pad 1 foot larger than the shed on every side, so a 10 by 12 ft shed takes a 12 by 14 ft pad and roof water drips onto gravel instead of soil against the shed walls. Volume is pad length times pad width times depth, divided by 324: 12 x 14 x 4 / 324 = 2.07 cubic yards at 4 inches. Then add the compaction allowance — loose stone packs down under the compactor, so order 15% more: 2.07 x 1.15 = 2.39 cubic yards. Tons are the ordered volume times the stone density: at 1.50 tons per cubic yard for crusher run, that is 3.58 tons.
The stone choice is the only judgment call in the whole page. Crusher run is the first choice for a shed base because it contains stone dust that locks together and stays level; clean #57 stone also works and drains better, but it does not lock and can shift under a heavy shed. The densities are the lumbermetrics pair — crusher run 1.50, clean #57 1.40 tons per cubic yard — so the same pad in clean stone is 2.39 x 1.40 = 3.34 tons. Some guides use heavier densities: shedplans uses 1.80 for crusher run, which puts the same 2.07 cubic yards at 3.7 tons, and lumabasket uses 1.4 for crushed stone with a 10% compaction allowance, which puts it at 3.2 tons. The volume never changes — only the density does — so confirm the figure with your supplier before ordering.
Depth is a site decision, not a preference: 4 inches of compacted stone is the common minimum on firm, well-drained soil, and 6 inches or more suits weaker soil or heavier loads. The same 12 by 14 ft pad at 6 inches is 3.11 cubic yards before compaction, 3.58 with 15%, or 5.36 tons of crusher run — half as much again as the 4-inch pad. A bigger shed scales the same way: a 12 by 16 ft shed takes a 14 by 18 ft pad, 3.11 cubic yards at 4 inches, 3.58 with compaction, 5.36 tons of crusher run.
The layers matter as much as the gravel. The build is landscape fabric on levelled soil, then the gravel inside timber edging, compacted in lifts. The fabric stops weeds and keeps the stone from sinking into the soil — the calculator counts it at the pad area, 168 square feet on the default, plus a little overlap. The timber edging holds the gravel in place: the default pad needs 2 x (12 + 14) = 52 feet of edging. A thin top layer of pea gravel, about 1 inch, is optional if you want a smoother surface to walk on — it is a finish, not part of the base.
Common mistakes: sizing the pad to the shed instead of a foot larger on every side, which leaves the shed walls sitting against wet soil; ordering the compacted volume instead of the loose volume, which leaves the pad an inch short after compaction; and skipping the fabric, which lets the stone sink into soft ground within a year. Check the level twice — a pad that is out of level by an inch across its width will rack a shed door — and follow your shed maker's base instructions, because local soil and frost rules can change what you need.
pad = shed + 1 ft on every side · volume = pad length x pad width x depth / 324 · order = volume x (1 + compaction) · tons = order x density · crusher run 1.50, clean #57 1.40 t/yd3 · 4 in firm soil, 6 in soft soil
Related tools
A driveway takes a deeper, two-layer build — use the Crushed Stone Driveway Calculator. For any other area, use the Gravel Calculator, and for the base under pavers, the Paver Base Calculator. Size the fabric with the Landscape Fabric Calculator.
Shed base gravel calculator FAQ
How much gravel do I need for a shed base?
Make the pad 1 ft larger than the shed on every side, multiply pad area by depth and divide by 324 for cubic yards, add 15% for compaction, then multiply by the stone density. A 10 by 12 ft shed takes a 12 by 14 ft pad: 2.07 cu yd at 4 in, 2.39 with compaction, 3.58 tons of crusher run.
How big should a gravel pad be for a shed?
One foot larger than the shed on every side — 2 feet longer and 2 feet wider in total. An 8 by 10 ft shed needs a 10 by 12 ft pad, a 10 by 12 ft shed a 12 by 14 ft pad, a 12 by 16 ft shed a 14 by 18 ft pad.
How deep should gravel be under a shed?
Four inches of compacted stone is the common minimum on firm, well-drained soil; 6 inches or more suits soft or wet ground and heavier sheds. The same 12 by 14 ft pad at 6 in needs 3.11 cu yd before compaction, 3.58 with it.
Crusher run or #57 stone for a shed base?
Crusher run is the first choice — its stone dust locks together and stays level. Clean #57 also works and drains better, but it does not lock and can shift under a heavy shed. Crusher run weighs about 1.50 tons per cubic yard, clean #57 about 1.40.
Why do different guides give different tonnage for the same shed?
The volume never changes — only the density and the compaction allowance do. This page uses 1.50 t/yd3 for crusher run with 15% compaction; shedplans uses 1.80 with no compaction step, lumabasket 1.4 with 10%. Confirm the density with your supplier before ordering.
Do I need landscape fabric under a shed base?
Yes — fabric under the gravel stops weeds and keeps the stone from sinking into the soil. Count it at the pad area plus a little overlap: 168 sq ft on the default 12 by 14 ft pad.
Do I need timber edging around a shed base?
It is strongly recommended: edging holds the gravel in place and keeps the pad square. The default pad needs 52 ft of edging. Without it, the gravel spreads and the pad thins at the edges.